Goulds Single Phase Sump, Effluent and Sewage Installation, Operation and Maintenance Instructions

ITT Goulds Pumps Single Phase Sump, effluent and Sewage installation, Operation and Maintenance instructions.


Goulds Single Phase Sump, Effluent and Sewage Installation, Operation and Maintenance Instructions - cover page
Brand
Goulds
Category
Other
Document type
User Manual
Language
English
Pages
36
File format
PDF
File size
1.4 MB
Published
18 November, 2023
Updated
18 November, 2023
MD5 checksum
CCEA4C01D500A6BECF3B24EAB0F9DC15

About this manual

This manual provides comprehensive instructions for the installation, operation, and maintenance of Goulds single-phase sump, effluent, and sewage pumps. It covers essential safety procedures, pre-installation checks, lifting guidelines, and piping requirements to ensure proper setup and performance.

What's inside

  • Safety Instructions
  • Pre-Installation Checks
  • Lifting of Pump
  • Piping
  • Wiring and Grounding
  • Selecting and Wiring Pump Control Panels
  • Float Switch and Panel Chart
  • Engineering Data
  • Trouble Shooting
  • Limited Warranty

Frequently asked questions

What type of oil should be used to refill the motor chamber if the level is low?

The motor chamber should be refilled with ASTM 150 turbine oil.

What are the required torque values for power cable strain assemblies?

Power cables should be torqued to 75 in. lbs. for #16 cables and 80 in. lbs. for all other cable assemblies.

What size relief hole is required in the discharge pipe if pumping wastewater containing solids?

A 3/16" (4.8mm) relief hole must be drilled in the discharge pipe.

Download PDF (1.4 MB)

More Goulds Manuals


View all Goulds manuals →