Winter Painting Dresser guide to good practices: Almost 80% of problems related to factory finished joinery & cladding are from items manufactured & supplied during winter months. Most site problems are related to either one or a combination of two factors: 1. Low temperatures; which affect the drying & curing of the coating system. 2. High humidity; which causes dimensional movement in the timber, opening joints to moisture. Practical steps in the factory: • Keep paint in a heated store before use & never leave paint cans on a cold floor. • Follow the film thickness specification. • Maintain a warm temperature of 15-20c in the drying area. • Avoid trying to accelerate drying by blistering hot air at the joinery items. This will speed up surface drying, but will trap moisture in the film & slow down the drying process. • Delay wrapping finished products for as long as possible, wrapping & storage in an unheated despatch area will slow or stop moisture release & prevent the full drying process from completion. Practical steps on site: • Remove airtight packaging, prior to storage to allow free ventilation of the joinery. • Store joinery off the ground on suitable bearers & cover with permeable sheet to protect from contamination. • Storage areas should be well ventilated & not subject to extremes of temperatures. Avoid unsuitable storage such as metal box containers & areas open to the elements. These may be subject to condensation & very high temperatures in direct sunlight. Water
This document addresses the high incidence of problems in factory-finished joinery and cladding caused by winter manufacturing conditions, specifically low temperatures and high humidity. It outlines practical steps for factories to manage paint storage, drying temperatures, and wrapping processes to ensure proper curing and moisture release.
The guide also provides instructions for site storage and assembly, emphasizing the need for ventilation, protection from extreme temperatures, and sealing of exposed end grain. It explains the relationship between timber moisture content and dimensional changes, noting that winter timber often arrives at sites with higher moisture levels than in the factory, leading to joint opening and potential moisture penetration.
The drying area must maintain a warm temperature between 15 and 20 degrees Celsius.
Timber dimensions vary by about 1% for every 3% change in moisture content.
Joinery typically arrives on site in winter with a moisture content of around 20 to 22%.