This manual provides operating instructions for the HAC415-100 AC load bank. The load bank is designed for testing 415 volt, three phase, 50 Hz UPS or generators.
The Hillstone HAC415-100 is an AC load bank designed for testing 415V, three-phase, 50Hz UPS systems or generators. It features pre-set, force-cooled, high-powered resistor channels that allow for manual adjustment of load current via an iHHC handheld controller. The unit is equipped with safety features such as internal fuse protection, fan motor overload protection, and an auto shutoff mechanism for mains interruptions.
| Max operating voltage | 415V three phase 50Hz |
|---|---|
| Max current rating | 150A per phase |
| Max power rating | 108 KW three phase |
| Resistor tolerance | +/-5% |
| Operating ambient temperature | 0 to +35 degC |
| Weight | 157KG |
The maximum power rating is 108 KW three phase.
The unit is designed for testing 415 volt, three phase, 50 Hz UPS or generators on a 4 wire, star, connection, plus earth.
The maximum power rating is 108 KW three phase.
At the end of any test the fans should be kept running for 5 – 10 minutes on no load to remove the residual heat.