This document analyzes the supply chain of the offshore wind industry in Taiwan.
This research report, commissioned by the British Office in Taipei, provides a detailed assessment of the offshore wind industry in Taiwan. It examines the current market status, policy frameworks, and the development of the local supply chain, noting that while Taiwan is a front-runner in the Asia-Pacific region, gaps remain in marine engineering and operation and maintenance (O&M). The document outlines the government's three-phase strategy targeting 5.6GW of installed capacity by 2025 and 20.6GW by 2035.
Taiwan is targeting 5.6GW of installed capacity by 2025 and 20.6GW by 2035.
The study identifies gaps in marine engineering, floating foundation technology, and operation and maintenance (O&M).
Swancor Renewable Energy’s Formosa 1 and Taipower’s Changhua Demonstration Project Phase 1 have entered the O&M period.
The Industrial Relevance Program (IRP) is the local content rules announced to promote local manufacture.