Supply Chain Study of Offshore Wind Industry in Taiwan

This document analyzes the supply chain of the offshore wind industry in Taiwan.


Supply Chain Study of Offshore Wind Industry in Taiwan - cover page
Category
Other
Document type
Other
Language
English
Pages
61
File format
PDF
File size
1.7 MB
Published
18 November, 2023
Updated
18 November, 2023
MD5 checksum
40984AE8C892678208A450E525325F0A

About this manual

This research report, commissioned by the British Office in Taipei, provides a detailed assessment of the offshore wind industry in Taiwan. It examines the current market status, policy frameworks, and the development of the local supply chain, noting that while Taiwan is a front-runner in the Asia-Pacific region, gaps remain in marine engineering and operation and maintenance (O&M). The document outlines the government's three-phase strategy targeting 5.6GW of installed capacity by 2025 and 20.6GW by 2035.

What's inside

  • Market Status and Future Growth
  • Policy Frameworks
  • Ports and Other Infrastructure
  • Project Development and Management
  • Wind Turbine Components
  • Balance of Plant
  • Installation and Commissioning
  • Operation and Maintenance
  • Supportive Services
  • Summary of Supply Chain Assessment

Frequently asked questions

What offshore wind capacity targets has Taiwan set for 2025 and 2035?

Taiwan is targeting 5.6GW of installed capacity by 2025 and 20.6GW by 2035.

Which supply chain areas are identified as gaps in Taiwan?

The study identifies gaps in marine engineering, floating foundation technology, and operation and maintenance (O&M).

Which two wind farms have entered the O&M period?

Swancor Renewable Energy’s Formosa 1 and Taipower’s Changhua Demonstration Project Phase 1 have entered the O&M period.

What local content rules promote local manufacture of wind turbine components and BOP systems?

The Industrial Relevance Program (IRP) is the local content rules announced to promote local manufacture.

Download PDF (1.7 MB)

Also Manuals