Design Guidelines for Headworks of Hydropower Projects

Design Guidelines for Headworks of Hydropower Projects


Design Guidelines for Headworks of Hydropower Projects - cover page
Brand
Department of Electricity Development
Document type
Other
Language
English
Pages
444
File format
PDF
File size
9.1 MB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
85C1BF30F283586F62046C7747049FFE

About this manual

Published by the Department of Electricity Development, Ministry of Water Resources, Government of Nepal, these guidelines establish procedural guidance for headworks of run-of-river hydropower projects in Nepal. They were prepared by M/S Shah Consult International (P.) Ltd. and cover survey and investigations, planning and design, construction, and operation and maintenance.

The guidelines apply to government, public and private sector agencies involved in headworks development. They lay down basic objectives, typical considerations, general principles and minimum requirements, and deviations are allowed when alternative procedures or criteria are justified in writing.

What's inside

  • Topographical Survey
  • Hydrological Investigations
  • Sedimentological Investigations
  • Geological and Geotechnical Investigations
  • Seismological Studies
  • Headworks Planning and Layout
  • Concrete Diversion Structures
  • Energy Dissipators
  • Embankment Dams
  • Fish Pass Structures

Frequently asked questions

Who prepared these guidelines?

They were prepared by M/S Shah Consult International (P.) Ltd. on behalf of the Department of Electricity Development.

Who must follow these guidelines?

They apply to government, public and private sector agencies involved in planning, design, construction, operation and maintenance of headworks of run-of-river hydropower projects in Nepal.

Are deviations from these guidelines allowed?

Yes, if the alternative procedures or criteria are justified in writing.

Download PDF (9.1 MB)