Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-11-17
Featured Department of Electricity Development manuals

Design Guidelines for Headworks of Hydropower Projects
Published by the Department of Electricity Development, Ministry of Water Resources, Government of Nepal, these guidelines establish procedural guidance for headworks of run-of-river hydropower projects in Nepal. They were prepared by M/S Shah Consult International (P.) Ltd. and cover survey and investigations, planning and design, construction, and operation and maintenance.
The guidelines apply to government, public and private sector agencies involved in headworks development. They lay down basic objectives, typical considerations, general principles and minimum requirements, and deviations are allowed when alternative procedures or criteria are justified in writing.
Covers: Topographical Survey · Hydrological Investigations · Sedimentological Investigations · Geological and Geotechnical Investigations · Seismological Studies · Headworks Planning and Layout
Latest Department of Electricity Development manuals
Design Guidelines for Headworks of Hydropower Projects
Other 444 pages · 9.1 MB · ENProcedural guidelines for survey, design, construction, operation and maintenance of headworks for run-of-river hydropower projects in Nepal.
Questions answered in Department of Electricity Development manuals
Who prepared these guidelines?
They were prepared by M/S Shah Consult International (P.) Ltd. on behalf of the Department of Electricity Development.
From: Design Guidelines for Headworks of Hydropower Projects
Who must follow these guidelines?
They apply to government, public and private sector agencies involved in planning, design, construction, operation and maintenance of headworks of run-of-river hydropower projects in Nepal.
From: Design Guidelines for Headworks of Hydropower Projects
