Doremi Labs IMB and NEC Series-2 Field Installer Manual

Doremi Labs IMB and NEC Series-2 Field Installer Manual describes how to install and set up the Doremi Labs IMB and NEC Series-2 projectors.


Doremi Labs IMB and NEC Series-2 Field Installer Manual - cover page
Brand
Doremi Labs
Category
Other Electronics
Document type
User Manual
Language
English
Pages
36
File format
PDF
File size
964 KB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
08CB8A0233FC9F718895A2F26BEFE9CE

About this manual

This document explains how to install the Integrated Media Block (IMB) into an NEC Series-2 projector and describes the steps required to perform the 'marriage' between the IMB and the projector electronics. The process requires a Doremi ShowVault server to function and involves physical and software interlocks to ensure the security of displayed materials.

What's inside

  • Introduction
  • Required Components
  • IMB Board Installation
  • ShowVault Server Set Up
  • IMB Marriage Procedure
  • Troubleshooting Instructions
  • Video Source Set Up
  • Maintenance
  • Replacing the IMB Battery
  • Document Revision History

Specifications

HD-SDI Input ComplianceSMPTE 292M and SMPTE 372M
HD-SDI Input Frequency3 GHz
HDCP SupportHDCP compatible
RTC Battery TypeCR1220
Minimum Battery Voltage2.4v

Frequently asked questions

How long do you have to replace the IMB battery after powering off the projector?

You have 5 minutes to complete the battery replacement after powering off the projector.

What is the part number for the Doremi IMB battery?

The Doremi part number is BAT12.5MM-LI-COIN.

Download PDF (964 KB)