Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-11-17
Featured Doremi Labs manuals

Doremi Labs IMB and NEC Series-2 Field Installer Manual
This document explains how to install the Integrated Media Block (IMB) into an NEC Series-2 projector and describes the steps required to perform the 'marriage' between the IMB and the projector electronics. The process requires a Doremi ShowVault server to function and involves physical and software interlocks to ensure the security of displayed materials.
Covers: Introduction · Required Components · IMB Board Installation · ShowVault Server Set Up · IMB Marriage Procedure · Troubleshooting Instructions
Latest Doremi Labs manuals
Doremi Labs IMB and NEC Series-2 Field Installer Manual
User Manual 36 pages · 964 KB · ENThis manual provides installation, configuration, and maintenance instructions for the Doremi Labs IMB board installed in NEC Series-2 projectors.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Doremi Labs manuals
How long do you have to replace the IMB battery after powering off the projector?
You have 5 minutes to complete the battery replacement after powering off the projector.
From: Doremi Labs IMB and NEC Series-2 Field Installer Manual
What is the part number for the Doremi IMB battery?
The Doremi part number is BAT12.5MM-LI-COIN.
From: Doremi Labs IMB and NEC Series-2 Field Installer Manual
