Proportionality Guidance for Impact Assessments and Post Implementation Reviews

This document provides proportionality guidance for impact assessments (IAs) and post implementation reviews (PIRs).


Proportionality Guidance for Impact Assessments and Post Implementation Reviews - cover page
Category
Other
Document type
Other
Language
English
Pages
21
File format
PDF
File size
329 KB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
CE9CC4E1BE50B6ACADC633E40780047A

About this manual

This guidance document outlines how the Regulatory Policy Committee (RPC) applies the Better Regulation Framework to ensure that the level of analysis in regulatory cases is proportionate to the problem being addressed. It emphasizes that while all new policies require a proportionate assessment of costs and benefits, the specific level of detail required depends on the measure's impact.

What's inside

  • Introduction
  • Level of analysis
  • Consultation stage IA
  • Final stage IA
  • Post Implementation Reviews
  • Figure 1 — Level of Impact
  • Figure 2 — Determining the level of impact(s)
  • Annex A - reasons behind EANDCB and SaMBA red rating
  • Annex B - accuracy

Frequently asked questions

What is the minimum accuracy required for EANDCBs?

The RPC expects EANDCBs to be accurate to within £100 million or 5% (whichever is smaller).

When is a measure considered high impact?

A measure is high impact if it has an EANDCB greater than +/- £50 million or NPSV greater than +/- £50 million, and meets specific attributes like affecting a large number of businesses.

Download PDF (329 KB)

Also Manuals