Trina Tracker Vanguard Solar Tracker Commissioning Manual

This document is a commissioning manual for the Vanguard product. It introduces the features and performance of the Vanguard product.


Trina Tracker Vanguard Solar Tracker Commissioning Manual - cover page
Brand
Trina Tracker
Category
Other
Document type
Installation Guide
Language
English
Pages
43
File format
PDF
File size
1.5 MB
Published
16 November, 2023
Updated
16 November, 2023
MD5 checksum
7F4895E9D0E07F9037AB04B477C758D5

About this manual

This document is the commissioning manual for the Vanguard solar tracker from Trina Tracker. It gives guidance and step-by-step instructions for the commissioning phase of the tracker, and states that the information is generic, so specifics such as row rotation angle, row spacing and the way wind alarms are transmitted are defined in the plans and documentation of each installation. Trina Tracker asks that the report be read before any checks are performed and that Trina Tracker technicians be contacted if there are doubts.

The manual covers general responsibilities and safety measures, preliminary commissioning requirements the client must guarantee, and the preliminary inspection of tracker assembly components. It then describes work on the motor and TCU for both the TCU SP and TCU SS versions, inclinometer angle adjustment, physical stops, barcode scanning and parameter settings for the TCU SP version, wind and snow checks, backtracking, synchronization, final tests, Zigbee and RS485 communications, and the requirements to complete commissioning and the final commissioning certificate.

What's inside

  • Object
  • General, responsibilities and safety measures
  • Preliminary commissioning requirements
  • Preliminary inspection
  • Turn motor / TCU
  • Inclinometer angle adjustment
  • Physical stops
  • Parameter settings (TCU SP version)
  • Wind
  • Backtracking

Specifications

TCU protection ratingIP65
Minimum internet speed for the industrial PC (data logger)8 Mbps stable upload/download
IP addresses per NCU (Zigbee communication)3
IP addresses per NCU (RS485 communication)2
Advance notice for preliminary commissioning informationMinimum of three weeks

Frequently asked questions

What does this Vanguard document provide?

It provides guidance and instructions for the commissioning phase of the tracker. The information is generic, so installation-specific details are given in the plans and documentation of each installation.

Who may carry out the commissioning of the solar tracker?

The team in charge of commissioning must be qualified and specialized in this type of work. Damage caused by unqualified staff is not covered by the tracker warranty.

How much advance notice must the client give Trina Tracker before preparatory work?

The client must give sufficient advance notice, with a minimum of three weeks prior to starting the preparatory work.

Which communication options are described for the trackers?

The manual describes plants with wireless communications (Zigbee) and plants with RS 485 bus communications. For RS485 installations the installer must have completed the BUS WIRING VERIFICATION test procedures.

Download PDF (1.5 MB)