Trina Tracker Vanguard Solar Tracker Commissioning Manual
This document is the commissioning manual for the Vanguard solar tracker from Trina Tracker. It gives guidance and step-by-step instructions for the commissioning phase of the tracker, and states that the information is generic, so specifics such as row rotation angle, row spacing and the way wind alarms are transmitted are defined in the plans and documentation of each installation. Trina Tracker asks that the report be read before any checks are performed and that Trina Tracker technicians be contacted if there are doubts.
The manual covers general responsibilities and safety measures, preliminary commissioning requirements the client must guarantee, and the preliminary inspection of tracker assembly components. It then describes work on the motor and TCU for both the TCU SP and TCU SS versions, inclinometer angle adjustment, physical stops, barcode scanning and parameter settings for the TCU SP version, wind and snow checks, backtracking, synchronization, final tests, Zigbee and RS485 communications, and the requirements to complete commissioning and the final commissioning certificate.
Covers: Object · General, responsibilities and safety measures · Preliminary commissioning requirements · Preliminary inspection · Turn motor / TCU · Inclinometer angle adjustment
Latest Trina Tracker manuals
Trina Tracker Vanguard Solar Tracker Commissioning Manual
Installation Guide 43 pages · 1.5 MB · ENCommissioning manual for the Trina Tracker Vanguard solar tracker, covering safety, inspection, TCU setup, wind alarms, backtracking and communications.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Trina Tracker manuals
What does this Vanguard document provide?
It provides guidance and instructions for the commissioning phase of the tracker. The information is generic, so installation-specific details are given in the plans and documentation of each installation.
From: Trina Tracker Vanguard Solar Tracker Commissioning Manual
Who may carry out the commissioning of the solar tracker?
The team in charge of commissioning must be qualified and specialized in this type of work. Damage caused by unqualified staff is not covered by the tracker warranty.
From: Trina Tracker Vanguard Solar Tracker Commissioning Manual