ECLIPSE™ Safety Pool Cover Underguide System Installation Guide
This installation guide covers the Coverstar Eclipse Safety Pool Cover Underguide System. It provides step-by-step instructions for installing cover guides, the roll-up mechanism, and cover fabric, along with a list of required tools.
Topics include standard and encapsulated underguide mounting, housing preparation, attaching the roll-up tube, adjusting mechanism height, anchoring the mechanism and pulley brackets, wiring the electrical switch, running ropes, and a home owner checklist for safe operation and maintenance.
| Guide space vs roll up tube length | three inches longer than the roll up tube length |
|---|---|
| Guide extension past housing | 1” past the inside of the housing |
| Drill hole depth for guides | approx. 3” deep |
It should be three inches longer than the roll up tube length.
Approximately 3 inches deep on a slight angle toward the pool wall.
Contact your Coverstar Representative.
Reverse the directional wires.