KOSTAL PLENTICORE PLUS / BI Solar Inverter Configuration Guide with BYD Premium HVS/HVM Batteries

This document describes how to set up and configure the KOSTAL Solar Electric Ibérica S.L. PLENTICORE PLUS / BI inverter for use with BYD Premium HVS/HVM batteries.


KOSTAL PLENTICORE PLUS / BI Solar Inverter Configuration Guide with BYD Premium HVS/HVM Batteries - cover page
Brand
Kostal
Category
inverter
Document type
Installation Guide
Language
Spanish
Pages
17
File format
PDF
File size
2.7 MB
Published
16 November, 2023
Updated
16 November, 2023
MD5 checksum
DD26EAEE0EC46C089878D2864D34D2EB

About this manual

This guide from KOSTAL Solar Electric Ibérica S.L. describes commissioning and configuration of the PLENTICORE PLUS/BI inverter with BYD Premium HVS/HVM batteries. It states that it does not replace the operating manuals required for correct assembly and installation.

The guide covers commissioning checks and the required battery activation code, connection of a compatible energy meter and the BYD battery via DC3 and RS485, LAN setup and access to the inverter web server. It also describes energy meter configuration, zero injection for the PLENTICORE Plus, battery setup with the Be Connect app, configuration in the inverter menu, data export to the KOSTAL Solar Portal, inverter updates, compatible meter options and KOSTAL SMART WARRANTY. This manual is written in Spanish.

What's inside

  • Commissioning
  • Energy meter connection
  • BYD Premium HVS/HVM battery connection
  • LAN network connection and configuration
  • Accessing the inverter web server
  • Energy meter configuration
  • Zero injection for PLENTICORE Plus
  • Configuring BYD HVS/HVM with the Be Connect app
  • Configuring BYD Premium HVS/HVM in PLENTICORE PLUS/BI
  • Exporting data to the KOSTAL Solar Portal

Specifications

Battery DC inputDC3
Battery communication portX601
Battery communication interfaceRS485
Maximum communication cable length15 m

Frequently asked questions

Which battery models are covered for setup with the PLENTICORE PLUS/BI?

The guide covers BYD Premium HVS/HVM batteries.

Which port on the inverter is used for RS485 communication with the BYD battery?

The RS485 communication cable connects to the inverter's X601 port.

What can cause the EC 6006 communication fault after meter configuration?

It can be due to incorrect RS485 pin connections between the inverter and the meter.

How is Zero Injection removed on the PLENTICORE Plus?

Configure the dynamic limit to the inverter's nominal power in the energy management menu.