Environmental, Health and Safety Guidelines for Mining Guideline

This guideline introduces the environmental, health and safety guidelines for the mining industry.


Environmental, Health and Safety Guidelines for Mining Guideline - cover page
Document type
Other
Language
Chinese
Pages
30
File format
PDF
File size
594 KB
Published
15 November, 2023
Updated
15 November, 2023
MD5 checksum
30567FDCB378EB5A2DBA275F8DF8CF2D

About this manual

The document is the Environmental, Health and Safety Guidelines for Mining, a technical reference document issued as part of the World Bank Group EHS Guidelines series. It applies to underground and open-pit mines, placer mining, solution mining, and marine dredging, and is used together with the General EHS Guidelines.

It covers water use and quality, waste, hazardous materials, land use and biodiversity, air quality, noise and vibration, energy use, and visual impact. The guideline recommends measures based on good international industry practice and requires projects to meet the higher of host-country rules or the guideline standards. This manual is written in Chinese.

What's inside

  • Preface
  • Applicability
  • Specific Industry Impacts and Management
  • Water Use and Water Quality
  • Stormwater
  • Acid Rock Drainage and Metal Leaching
  • Groundwater Protection
  • Waste
  • Indicators and Monitoring
  • References and Other Sources

Frequently asked questions

What types of mining activities does the guideline apply to?

It applies to underground and open-pit mining, placer mining, solution mining, and marine dredging.

Which environmental topics are covered by the guideline?

Topics include water use and quality, waste, hazardous materials, land use and biodiversity, air quality, noise and vibration, energy use, and visual impact.

What standard applies when host country rules differ from the guideline?

Projects must meet the higher of the host-country rules or the guideline indicators and measures.

What return period must temporary drainage structures satisfy?

Temporary drainage structures must satisfy at least a 25-year/24-hour return period.

Download PDF (594 KB)

Also Manuals