JT-SB216JSH Series Hand Dryer Installation Manual
This manual is for dealers and installers of the JT-SB216JSH heater model and JT-SB216KSN heater-less model hand dryers. It covers safety precautions, pre-installation checks, parts and external dimensions, installation conditions, wiring, mounting, and test run.
It specifies single-phase 220-240V AC power, required clearances, suitable walls, and included accessories. For JT-SB216JSH models, heater ON/OFF and air speed HIGH/STANDARD settings must be confirmed with the customer before installation.
| Power supply | Single-phase 220-240V AC |
|---|---|
| Appliance color | W (White), H (Dark grey), S (Silver) |
| Heater-less model number | JT-SB216KSN-W-NE |
| Maximum width of main unit | 219 mm |
| Recommended installation height | 925 mm for men, 905 mm for women |
It requires single-phase 220-240V AC power.
No. For JT-SB216JSH models, the heater ON/OFF and air speed HIGH/STANDARD settings must be checked with the customer before installation because the customer cannot adjust them afterward.
Yes, a ground-fault circuit interrupter must be installed.