Precision Hydrogen 1200cc (All Models) Installation Guide
This installation guide provides step-by-step instructions for unpacking and positioning the Peak Scientific Precision Hydrogen 1200cc hydrogen generator, connecting hydrogen delivery and exhaust tubing, removing transit plugs, and connecting the generator to the application.
It also covers connecting and filling the water bottle with high grade de-ionised water, replacing the lid, and includes safety notices, warning and caution symbols, and a parts list for the supplied fittings.
| Clearance around generator | At least 7.5 cm to the sides and rear |
|---|---|
| Hydrogen delivery tubing material | Clean, laboratory grade copper or stainless steel only |
| Water quality | High grade de-ionised water below 1 µS/cm |
| Lifting requirement | Two-person lift |
Visit www.peakscientific.com/downloads to download the full user manual for your gas generator.
The tubing must be clean, laboratory grade copper or stainless steel only.
Use high grade de-ionised water with conductivity below 1 µS/cm.
Ensure at least 7.5 cm of space to the sides and rear of the generator.