This is an instruction manual that guides users on how to install the Peak Scientific Corona 1010 gas generator
This is the Rev 2 installation guide (PN IG-0016) for the Peak Scientific Corona 1010 gas generator. It is written as a step-by-step quick start guide to help you install and configure the generator, and it points to the full User Manual on the Peak Scientific downloads page for specifications, operating instructions, service requirements and troubleshooting.
The guide covers the safety notices and symbols used in the document, the contents of the fittings kit, unpacking and positioning the unit, fitting the 1/4" compression fittings and Teflon tubing, connecting the correct mains cable for your supply, switching the unit on and reading the front-panel LED status. General notes on electrical requirements, an optional Corona Air Compressor air supply and product warranty registration are also included.
| Power supply | 110-230VAC 50/60Hz single phase |
|---|---|
| Electrical requirements tolerance | 110-230VAC nominal +/- 10% depending on chosen model |
| Nitrogen port tubing material | Copper or stainless steel only |
| Supplied Teflon tubing | 1/4" Teflon tubing, 3 m |
| Mains input connector | IEC 60320/C13 |
The front LEDs illuminate YELLOW during start-up and turn GREEN when the generator is ready to use.
A 110-230VAC 50/60Hz single phase supply, using the correct mains cable for your supply voltage.
Only copper or stainless steel tubing of greater than 1 m in length should be connected to the NITROGEN port.
You have 1 month to register the product from the date of installation; the warranty is then honoured for 12 months.