Small Fire Pump and Standpipe Handling Manual

This is a manual about small fire pump and fire hose operations


Small Fire Pump and Standpipe Handling Manual - cover page
Category
Other
Document type
User Manual
Language
Japanese
Pages
20
File format
PDF
File size
1.1 MB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
E1BCF544447443DEF17808A5B0B29120

About this manual

Sagamihara City issued this handling manual in September 2013 for initial firefighting equipment, namely a small fire pump and a standpipe. It explains equipment names, preparation, transport, cover opening, hose and suction hose connections, nozzle posture, and discharge procedures.

The manual states that the small fire pump must be operated by at least four people and uses a 30:1 fuel mixture. It also covers standpipe attachment to hydrants or drain valves, hose extension and connection, and coordinated discharge with safety precautions. This manual is written in Japanese.

What's inside

  • Equipment inventory and names
  • Small fire pump handling
  • Standpipe handling
  • Pre-use preparation
  • Fire cistern and hydrant covers
  • Suction hose and hose connections
  • Nozzle connection and discharge posture
  • Discharge operation and safety

Frequently asked questions

How is water discharged from a standpipe?

Turn the hydrant handle to the left (arrow direction) to release water, coordinating with the nozzle operator.

What fuel mixture should be put into the fuel tank before use?

Before use, put a 30:1 mixed fuel into the fuel tank.

About how far from the fire water tank should the small fire pump be placed?

Place the small fire pump about 1 meter away from the fire water tank.

Download PDF (1.1 MB)

Also Manuals