This document describes the process of using solvent cement for PVC pipe installation.
This document provides a step-by-step procedure for solvent cement jointing PVC pipes. It details the preparation of the pipe and socket, the application of priming fluid and solvent cement, and the insertion and holding of the joint to ensure a proper bond.
| Curing time at 16°C and above | 24 hours |
|---|---|
| Curing time at 0°C | 48 hours |
| Minimum hold time | 30 seconds |
| Minimum wait before pressurising | fully cured |
The joint must be held against movement for a minimum of 30 seconds.
The line should not be pressurised until the joint is fully cured.