Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-11-03
Featured Vinidex manuals

Vinidex VIN340A PVC Pipe Solvent Cement Installation Guide
This document provides a step-by-step procedure for solvent cement jointing PVC pipes. It details the preparation of the pipe and socket, the application of priming fluid and solvent cement, and the insertion and holding of the joint to ensure a proper bond.
Covers: Prepare the pipe · Witness mark the pipe · Dry fit the joint · Prepare with priming fluid · Brush selection · Apply solvent cement
Latest Vinidex manuals
Vinidex VIN340A PVC Pipe Solvent Cement Installation Guide
User Manual 3 pages · 432 KB · ENQuick installation guide for solvent cement jointing of PVC pipes, covering preparation, application, and curing procedures.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Vinidex manuals
How long should the joint be held after insertion?
The joint must be held against movement for a minimum of 30 seconds.
From: Vinidex VIN340A PVC Pipe Solvent Cement Installation Guide
When can the pipe be pressurised after installation?
The line should not be pressurised until the joint is fully cured.
From: Vinidex VIN340A PVC Pipe Solvent Cement Installation Guide
