Aquaenergy Oxidacion Total 5 & 10 Inhabitants Biological Wastewater Treatment Plant Installation Manual

The document is an installation guide for the biological oxidation total of 5 and 10 residents. It mainly introduces the function and features of the purifier and the installation method


Aquaenergy Oxidacion Total 5 & 10 Inhabitants Biological Wastewater Treatment Plant Installation Manual - cover page
Brand
Aquaenergy
Category
Other
Document type
Installation Guide
Language
Spanish
Pages
8
File format
PDF
File size
4.9 MB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
0792B5559D585C2D16E5E6B5D06CF75F

About this manual

This manual covers the installation of Aquaenergy Oxidacion Total biological wastewater treatment plants sized for 5 and 10 inhabitants. The units are designed for underground burial and are supplied with two blower pumps and an electrical control panel inside the equipment.

The document details civil works requirements (excavation, reinforced concrete slab, sand bedding), pneumatic and electrical connections for the blowers, maintenance procedures (annual sludge evacuation, weekly screening, blower consumption checks), and installation observations including maximum burial depth, minimum distance from water wells, and blower placement limits. This manual is written in Spanish.

What's inside

  • Civil Works
  • Pneumatic Connection of Blowers
  • Electrical Connection
  • Maintenance
  • Observations

Specifications

Concrete slab thicknessApproximately 100 mm
Sand bedding thickness100–150 mm
Backfill height per stageApproximately 400 mm
Maximum burial depth from top50 cm
Minimum distance from water well25 meters
Maximum blower distance from reactor20 meters

Frequently asked questions

What components are supplied inside the treatment plant?

The equipment is supplied with 3 packages containing 2 blower pumps and the electrical control panel.

How often should sludge be removed from the unit?

Sludge should be evacuated annually (¾ of accumulated sludge at the bottom of the compartments), or every 6 months depending on saturation level.

Can the treatment plant be buried more than 50 cm deep?

No, the tank must not be buried more than 50 cm from the top. For deeper installations, concrete side walls must be built to carry the surface load.

What is the maximum distance for blower installation from the reactor?

The blower must be installed no more than 20 meters from the reactor, in a weather-protected enclosure away from dust.

Download PDF (4.9 MB)