Aquaenergy Oxidacion Total 5 & 10 Inhabitants Biological Wastewater Treatment Plant Installation Manual
This manual covers the installation of Aquaenergy Oxidacion Total biological wastewater treatment plants sized for 5 and 10 inhabitants. The units are designed for underground burial and are supplied with two blower pumps and an electrical control panel inside the equipment.
The document details civil works requirements (excavation, reinforced concrete slab, sand bedding), pneumatic and electrical connections for the blowers, maintenance procedures (annual sludge evacuation, weekly screening, blower consumption checks), and installation observations including maximum burial depth, minimum distance from water wells, and blower placement limits. This manual is written in Spanish.
Covers: Civil Works · Pneumatic Connection of Blowers · Electrical Connection · Maintenance · Observations
Latest Aquaenergy manuals
Aquaenergy Oxidacion Total 5 & 10 Inhabitants Biological Wastewater Treatment Plant Installation Manual
Installation Guide 8 pages · 4.9 MB · ESInstallation and maintenance manual for Aquaenergy Oxidacion Total 5 and 10 Inhabitants biological wastewater treatment plants.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Aquaenergy manuals
What components are supplied inside the treatment plant?
The equipment is supplied with 3 packages containing 2 blower pumps and the electrical control panel.
How often should sludge be removed from the unit?
Sludge should be evacuated annually (¾ of accumulated sludge at the bottom of the compartments), or every 6 months depending on saturation level.