Ingeteam INGECON SUN LITE Inverter Installation Manual

This manual describes the installation process of INGECON® SUN LITE.


Ingeteam INGECON SUN LITE Inverter Installation Manual - cover page
Brand
Ingeteam
Category
inverter
Document type
Installation Guide
Language
Spanish
Pages
72
File format
PDF
File size
3.7 MB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
BD5FF232297D97CE4E7364B9E4C30E2B

About this manual

This is the installation manual (document AAY2000IKH01, Rev. _A, July 2010, 72 pages) for the INGECON SUN LITE inverter from Ingeteam Energy S.A. The safety notice states that it contains instructions for the installation, handling and use of the INGECON SUN 2.5 TL, 3 TL, 3.3 TL, 3.68 TL, 3.8 TL, 4.6 TL, 5 TL and 6 TL models, as well as the INGECON SUN 2.5, 3.3 and 5, and models derived from them.

The manual describes the equipment and its options, CE marking and grid-connection regulations, location requirements (environment, IP grade, ambient temperature, atmospheric conditions, pollution degree, noise, ventilation, anchoring surface, altitude), environmental characteristics and EMC requirements, reception, handling, transport, storage and waste treatment. It then gives safety instructions with the required personal protective equipment, installation (wall fixing, cable entries, DC/AC/communications connectors, grounding and grid connection, photovoltaic field connection, electrical disconnection), commissioning and preventive maintenance. This manual is written in Spanish.

What's inside

  • Overview and equipment description
  • CE marking and grid-connection regulations
  • Location and environmental requirements
  • EMC requirements
  • Reception, handling, transport and storage
  • Safety instructions
  • Installation and wall fixing
  • Electrical connection
  • Commissioning
  • Preventive maintenance

Specifications

Models coveredINGECON SUN 2.5 TL, 3 TL, 3.3 TL, 3.68 TL, 3.8 TL, 4.6 TL, 5 TL, 6 TL; INGECON SUN 2.5, 3.3, 5
Residual charge timeThe equipment can remain charged up to 5 minutes after removing the photovoltaic field and grid supply
Voltage measurement equipmentCategory III, 1000 V
CommunicationsRS485 serial line connection
Grid-connection standards referencedVDE0126-1-1 disconnection device, ENEL Distribuzione regulations, G83/1 engineering recommendations, Australian and New Zealand regulations

Frequently asked questions

Who is allowed to carry out the operations described in the manual?

Only qualified personnel. The manual states that the detailed operations may only be performed by qualified staff, and that all applicable electrical safety legislation must be complied with.

Is there still a shock hazard after disconnecting the grid and the photovoltaic field?

Yes. The manual warns of electric shock risk even after disconnecting the grid and the photovoltaic field, and the equipment can remain charged for up to 5 minutes.

Which personal protective equipment is required?

The standard personal protective equipment is safety glasses against mechanical risk, safety glasses against electrical risk, safety footwear and a helmet.

Which steps must be completed before working without voltage?

The five golden rules: disconnect, prevent any possible reconnection, verify the absence of voltage, ground and short-circuit, and protect against nearby live parts with safety signage.