Beijer X2 Operator Panel Installation Guide

This manual explains how to install the X2 series of operator panels


Beijer X2 Operator Panel Installation Guide - cover page
Brand
Beijer
Document type
Installation Guide
Language
English
Pages
62
File format
PDF
File size
2.6 MB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
E4256F139EE3208E47F4F27B9AE14F83

About this manual

This guide provides step-by-step instructions for installing Beijer X2 operator panels, including safety precautions, space requirements, wiring connections, and technical data. It covers various panel sizes (4" to 21") and includes details on grounding, EMC protection, and battery replacement. Only qualified personnel should install or maintain the equipment.

The X2 panel supports integration with PLCs, servos, and drives, and features text display, dynamic indication, time channels, alarms, and recipe handling. The guide also addresses disposal under WEEE regulations and environmental considerations such as temperature and humidity.

What's inside

  • Safety Precautions
  • Naming Convention
  • Installation
  • Technical Data
  • Chemical Resistance
  • Operator Panel Drawings
  • Additional Installation Tips

Specifications

IP RatingIP20 (minimum), IP65 when installed in an apparatus

Frequently asked questions

What types of equipment can the X2 panel connect to?

The panel can connect to PLCs, servos, or drives for automation control.

What is the maximum installation plate thickness for the 4-inch and 7-inch models?

The maximum installation plate thickness is 11 mm for the 4-inch model and 10 mm for the 7-inch model.

What type of battery is required for the X2 operator panel?

The panel requires a BR 2032 battery, and using any other type may cause a fire or explosion.

What are the wire size and torque specifications for Phoenix connectors on the X1/X100 terminal block?

You must use AWG 30–12 copper conductors with a torque of 5–7 Lb.In.

Download PDF (2.6 MB)

More Beijer Manuals


View all Beijer manuals →