AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual

This manual introduces the installation and operation of ATC and ATC Orion series sputtering systems, including warnings, uncrating, cleaning and reassembly, important installation details, utility connections, and initial system power-up.


AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual - cover page
Brand
AJA International
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
30
File format
PDF
File size
145 KB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
F0359D0F733C3E89672D4A99A40AE9C8

About this manual

This manual provides sequential instructions for installing and operating AJA International ATC and ATC Orion Series sputtering systems. It covers essential safety warnings regarding high voltage, RF power, and cooling water, as well as procedures for uncrating, cleaning, and reassembling vacuum components. The guide details utility connections including electrical, cooling water, process gas, and mechanical pumps.

What's inside

  • Warnings
  • Uncrating System
  • Cleaning & Reassembly
  • Utility Connections
  • Initial Power Up
  • Chamber Cleaning & Target Installation
  • Substrate Preparation
  • Pumpdown and Load-Lock Transfer
  • Deposition Processing
  • Preventative Maintenance

Frequently asked questions

What should RF biasing of the substrate be limited to?

RF biasing of the substrate should be limited to 50 WATTS; 10-30 W should be more than adequate for substrates up to 6 “ diameter.

What incoming cooling water temperature is recommended in humid environments?

In humid environments, the incoming cooling water temperature should be elevated to 25 °C to prevent condensation.

How should a turbopump be vented?

When the turbopump is shut off, the delayed vent valve releases a specific amount of nitrogen into the side of the pump rotor.

What parts must be properly grounded and at the same potential?

The vacuum chamber, system frames, and grounding stud on the rear of the power distribution box must be properly grounded and at the same potential.