Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-31
Featured AJA International manuals

AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual
This manual provides sequential instructions for installing and operating AJA International ATC and ATC Orion Series sputtering systems. It covers essential safety warnings regarding high voltage, RF power, and cooling water, as well as procedures for uncrating, cleaning, and reassembling vacuum components. The guide details utility connections including electrical, cooling water, process gas, and mechanical pumps.
Covers: Warnings · Uncrating System · Cleaning & Reassembly · Utility Connections · Initial Power Up · Chamber Cleaning & Target Installation
Latest AJA International manuals
AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual
User Manual 30 pages · 145 KB · ENInstallation and operation manual for AJA International ATC and ATC Orion Series sputtering systems, covering setup, safety, and maintenance.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in AJA International manuals
What should RF biasing of the substrate be limited to?
RF biasing of the substrate should be limited to 50 WATTS; 10-30 W should be more than adequate for substrates up to 6 “ diameter.
From: AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual
What incoming cooling water temperature is recommended in humid environments?
In humid environments, the incoming cooling water temperature should be elevated to 25 °C to prevent condensation.
From: AJA International ATC & ATC Orion Series Sputtering Systems Installation & Operation Manual
