DirectSoft User Manual, introduces the installation, startup, programming quick start, communication connection, program running and monitoring of the software
This Chinese-language second-edition beginner's manual corresponds to DirectSOFT 5.0 and is published under Koyo Electronics (Wuxi). It explains installing and starting the Windows PLC programming software, creating a first project, and establishing a serial communication connection between a computer and a PLC.
The manual also covers the programming environment, ladder program editing, document editing, other views, and monitoring and debugging. It lists recommended computer requirements and describes toolbars, status bar, options, colors, themes, screen splitting, rungs, nicknames, cross-reference, PID view, data view, and TEST-RUN/TEST-STOP debug operations. This manual is written in Chinese.
| CPU | Pentium/Celeron, 1 GHz or higher |
|---|---|
| RAM | 512 MB |
| Hard disk space | 40 MB or more; 70 MB for full installation |
| Operating system | Windows 98, 2000, XP |
| Serial port | One unused serial communication port |
A Pentium or Celeron CPU at 1 GHz or higher is recommended.
Windows 98, 2000, and XP are listed.
A full installation requires 70 MB.
Debug mode has TEST-RUN and TEST-STOP states.