This manual describes the installation process for the Sun Fire E6900/E4900 system. This manual includes preparing for installation, moving and securing the Sun Fire E6900 system, connecting power cables to the Sun Fire E6900 system, connecting I/O components, connecting the management console, and turning on the Sun Fire E6900 system.
This document is a Chinese-language installation guide for Sun Fire E6900 and E4900 systems. It covers preparation checks for circuits, air conditioning, and floor area, then installation steps for each system.
For the E6900 system it describes moving and securing the system, power cable connections, I/O component connections, management console connections, powering on and off, and installing additional hardware and peripherals. For the E4900 system it describes rail installation, power connections, front panel and cabinet fixings, controller connections, I/O and console connections, powering on and off, and I/O card visibility issues. This manual is written in Chinese.
Checking circuits.
Using a virtual modem cable or through a network terminal server (NTS), connecting to the TTYa serial port on the system controller board.
Using a shielded Category 5 Ethernet cable connected to the RJ-45 Ethernet port on the main system controller board.
Only after the factory initial configuration is fully installed, the Sun Fire system boots successfully, and the boot self-test is completed.