Sun Microsystems Sun Fire E6900/E4900 System Installation Guide

This manual describes the installation process for the Sun Fire E6900/E4900 system. This manual includes preparing for installation, moving and securing the Sun Fire E6900 system, connecting power cables to the Sun Fire E6900 system, connecting I/O components, connecting the management console, and turning on the Sun Fire E6900 system.


Sun Microsystems Sun Fire E6900/E4900 System Installation Guide - cover page
Brand
Sun Microsystems
Category
Servers Computer
Document type
Installation Guide
Language
Chinese
Pages
54
File format
PDF
File size
3.7 MB
Published
31 October, 2023
Updated
31 October, 2023
Models
E6900, E4900
MD5 checksum
9BD70527B4BD4D115E4A9FC1BFF1C2DE

About this manual

This document is a Chinese-language installation guide for Sun Fire E6900 and E4900 systems. It covers preparation checks for circuits, air conditioning, and floor area, then installation steps for each system.

For the E6900 system it describes moving and securing the system, power cable connections, I/O component connections, management console connections, powering on and off, and installing additional hardware and peripherals. For the E4900 system it describes rail installation, power connections, front panel and cabinet fixings, controller connections, I/O and console connections, powering on and off, and I/O card visibility issues. This manual is written in Chinese.

What's inside

  • Preparing for installation
  • Installing the Sun Fire E6900 system
  • Installing the Sun Fire E4900 system
  • Power connections
  • Connecting I/O components
  • Connecting the management console
  • Powering on and off
  • Installing additional hardware and peripherals
  • I/O card visibility

Frequently asked questions

What is the first preparation step listed before installation?

Checking circuits.

How is an ASCII terminal connected for initial system setup?

Using a virtual modem cable or through a network terminal server (NTS), connecting to the TTYa serial port on the system controller board.

How is the management console connected after system setup?

Using a shielded Category 5 Ethernet cable connected to the RJ-45 Ethernet port on the main system controller board.

When can additional hardware be installed?

Only after the factory initial configuration is fully installed, the Sun Fire system boots successfully, and the boot self-test is completed.

Download PDF (3.7 MB)

More Sun Microsystems Manuals


View all Sun Microsystems manuals →