Changzhou E-Jing Solar PV Module Installation Manual

This manual introduces the installation methods of Changzhou E-Jing photovoltaic components, including installation conditions, mechanical installation, electrical installation, grounding, operation and maintenance.


Changzhou E-Jing Solar PV Module Installation Manual - cover page
Brand
Changzhou E-Jing
Document type
Installation Guide
Language
Chinese
Pages
21
File format
PDF
File size
2.1 MB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
00623178E18F2012F827EB6D1D2822C4

About this manual

This manual provides detailed instructions for installing Changzhou E-Jing solar photovoltaic modules, including safety precautions, mechanical mounting, electrical connections, and maintenance. It covers component identification, installation conditions, grounding, and operational safety. The document is intended for qualified installers and includes warnings about electrical hazards, fire risks, and proper handling procedures.

The manual also outlines installation requirements such as location selection, tilt angle, environmental conditions, and compliance with local regulations. It includes specific safety guidelines for rooftop installations, handling damaged components, and preventing fire hazards. All content is proprietary to Changzhou E-Jing and does not constitute a warranty. This manual is written in Chinese.

What's inside

  • Introduction
  • Regulations and Laws
  • General Information
  • Installation Conditions
  • Mechanical Installation
  • Electrical Installation
  • Grounding
  • Operation and Maintenance

Frequently asked questions

What is the stated operating temperature limit for the PV modules?

The module operating temperature should be limited to between -40℃ and 85℃.

How much distance should be kept between the module frame surface and the roof surface for the fire rating?

The distance between the module frame surface and the roof surface should be at least 115mm.

What should be done to a defective PV module before it is put into a cardboard box?

The correct method is to completely shade the PV cells before placing the defective PV module into a cardboard box.

What does the manual say about installing PV modules horizontally?

Do not install PV modules horizontally, because accumulated water may cause dirt or white frost on the glass surface.

Download PDF (2.1 MB)