Rotork AB 232 242 300 Series Quarter Turn Gearbox Installation and Operating Manual

This manual provides information on the technical data, handling and safety precautions, installation, standard conditions, IP rating and certificates for gearboxes.


Rotork AB 232 242 300 Series Quarter Turn Gearbox Installation and Operating Manual - cover page
Brand
Rotork
Category
Other
Document type
User Manual
Language
English
Pages
20
File format
PDF
File size
1.1 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
346660BC4441C13BAEF5670380CB8946

About this manual

The manual covers the AB, 232, 242 and 300 series quarter turn gearboxes from Rotork Gears BV, designed for manual operation of valves such as butterfly and ball valves in pipelines. It states that the manual is valid only for standard gearboxes of these series and that special versions may differ.

It includes technical data and a maximum allowable input and output torque table by gearbox type, handling and safety precautions, maintenance and storage instructions, mounting to the valve, set screw adjustment, operating instructions, handwheel types, IP ratings and certificates. Document number PUB033-005-00_1214 appears on the pages.

What's inside

  • Introduction
  • Technical data specifications
  • Maximum allowable input- and output torque
  • Handling and safety precautions
  • Maintenance
  • Storage
  • Installation: mounting to the valve
  • Adjustment of set screws
  • Operating instruction
  • IP rating

Specifications

Maximum manual input and output torque (AB 150)16 Nm input / 150 Nm output
Maximum manual input and output torque (242-10)15 Nm input / 150 Nm output
Maximum manual input and output torque (232-05O)13 Nm input / 125 Nm output
Valve connection standardISO 5211/1
Enclosure protectionIP65, 67 and 68
Low-temperature versionGearboxes for –60°C operation

Frequently asked questions

What are the AB, 232, 242 and 300 gearboxes designed for?

They are quarter turn gearboxes intended for manual operation of valves, such as butterfly and ball valves, in pipelines.

How often should maintenance checks be carried out?

Checks are recommended three months after commissioning and each year, with a test run every six months.

Can the input shaft or handwheel be used to lift the gearbox?

No. The text says the input shaft or hand wheel cannot be used for lifting the gearbox.

What should be applied to the bore hole and coupling before mounting?

A suitable anticorrosive or sticky grease should be applied to the inside bore hole and coupling before mounting.

Download PDF (1.1 MB)

More Rotork Manuals


View all Rotork manuals →