This manual introduces installation and operation methods of On-Grid PV Inverter.
This manual provides step-by-step instructions for installing, operating, commissioning, and maintaining the Afore New Energy S06018-02 on-grid PV inverter. It covers safety precautions, mounting guidelines, electrical connections, control panel operation, troubleshooting, and maintenance schedules. The document is intended for qualified personnel and includes fault code tables and recommended actions for common issues.
The inverter supports single-phase operation with one or two MPPT trackers and must be installed indoors or outdoors with IP65 protection. It requires proper grounding, lightning protection, and adherence to voltage/current limits to ensure safe operation. This manual is written in Chinese.
AC side: nominal discharge current 20kA, second grade lightning protection, protection voltage 2.5kV. DC side: nominal discharge current 20kA, second grade lightning protection, protection voltage 3.2kV.
The wiring distance should be at least 5 meters.
The ambient temperature should be within -25°C ~ 60°C.
The inverter is designed for indoor and outdoor installation (IP65).