Installation and operation manual for Afore New Energy on-grid PV inverters, covering safety, mounting, electrical connection, and troubleshooting.
This manual provides instructions for the installation, commissioning, operation, and maintenance of Afore New Energy on-grid PV inverters. It is intended for qualified personnel and covers models including the HNS3000TL through HNS6000TL series. The document outlines safety precautions, system diagrams, and specific requirements for mounting and electrical connections.
| Grid Voltage | 220/230 Vac |
|---|---|
| Grid Frequency | 50/60Hz |
| IP Rating | IP65 |
| Operating Temperature | -25 ~ 60°C |
| Isolation Resistance | 10 kΩ |
All work on the inverter must be carried out by qualified electricians.
One must wait 5 minutes after disconnecting both DC and AC power supply.
The wiring distance should be at least 5 meters.