MHG Heating ProCon HT & HTP 150 & 225 Floor Standing Condensing Boiler Installation and Operating Manual

This is the instruction manual for ProCon HT & HTP 150 & 225 Floor Standing Condensing Boiler Range


MHG Heating ProCon HT & HTP 150 & 225 Floor Standing Condensing Boiler Installation and Operating Manual - cover page
Brand
MHG Heating
Category
Heater
Document type
User Manual
Language
English
Pages
88
File format
PDF
File size
4.2 MB
Published
29 October, 2023
Updated
29 October, 2023
MD5 checksum
9860C7015B4CDC6C7D53A842E8942035

About this manual

The ProCon HT & HTP range consists of five build types: Single Units, Cascade Manager Units, Cascade Slave Units, System Separation Plate Heat Exchanger Units, and Cascade Manager units for the 225 model. These units are designed for floor standing installation and include integral low loss headers or require external headers depending on the specific build type. The manual details the hydraulic connections, sensor placements, and wiring requirements for both single and cascade configurations.

What's inside

  • Appliance Type
  • Installation Regulations and Requirements
  • Dimensions
  • Technical Data
  • Electrical Connections
  • Hydraulic Design
  • Fluing Options
  • Appliance Controls
  • Appliance Error Codes
  • Commissioning

Specifications

Warranty Period24 months
Primary Heat Exchanger Warranty60 months
Product Code (150 Single Unit)96.30000-7182
Product Code (225 Single Unit)96.30000-7183

Frequently asked questions

What regulations must be followed for installation?

Installation must comply with Gas Safety (Installation & Use) Regulations 1994, Health & Safety at Work Act, Building Regulations, and IEE Regulations.

What tools are required to remove the appliance case?

A 4.0mm Allen Key is required to initiate the removal of the appliance case.

Download PDF (4.2 MB)