Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-29
Featured MHG Heating manuals

MHG Heating ProCon HT & HTP 150 & 225 Floor Standing Condensing Boiler Installation and Operating Manual
The ProCon HT & HTP range consists of five build types: Single Units, Cascade Manager Units, Cascade Slave Units, System Separation Plate Heat Exchanger Units, and Cascade Manager units for the 225 model. These units are designed for floor standing installation and include integral low loss headers or require external headers depending on the specific build type. The manual details the hydraulic connections, sensor placements, and wiring requirements for both single and cascade configurations.
Covers: Appliance Type · Installation Regulations and Requirements · Dimensions · Technical Data · Electrical Connections · Hydraulic Design
Latest MHG Heating manuals
MHG Heating ProCon HT & HTP 150 & 225 Floor Standing Condensing Boiler Installation and Operating Manual
User Manual 88 pages · 4.2 MB · ENThis manual provides installation and operating instructions for the MHG Heating ProCon HT & HTP 150 & 225 floor standing condensing boiler range, covering…
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in MHG Heating manuals
What regulations must be followed for installation?
Installation must comply with Gas Safety (Installation & Use) Regulations 1994, Health & Safety at Work Act, Building Regulations, and IEE Regulations.
What tools are required to remove the appliance case?
A 4.0mm Allen Key is required to initiate the removal of the appliance case.
