Feisite PP-R Pipe Installation Guide

PPR pipe installation instructions


Feisite PP-R Pipe Installation Guide - cover page
Brand
Feisite
Document type
Installation Guide
Language
Chinese
Pages
3
File format
PDF
File size
142 KB
Published
29 October, 2023
Updated
29 October, 2023
MD5 checksum
D9AD285398AE392009E501A95C3CB7C5

About this manual

This guide explains how to install Feisite PP-R pipes using hot-melt connections for plumbing systems. It includes detailed steps for cutting, cleaning, heating, and joining pipes with fittings. Also covers metal-threaded connections and important safety and storage guidelines.

The guide emphasizes using only Feisite-compatible components, proper heating times based on pipe diameter, and precautions for winter installation to avoid damage. This manual is written in Chinese.

What's inside

  • Product Introduction
  • Hot-Melt Connection Method
  • Threaded Connection Method
  • Installation Precautions
  • Transport and Storage
  • Warranty and Liability

Specifications

Hot-Melt Temperature260±10℃
Cooling Time (for 90mm pipe)8 minutes
Heating Time (for 20mm pipe)5 seconds

Frequently asked questions

What is the recommended heating time for a 25mm pipe?

7 seconds.

Can Feisite pipes be connected to non-Feisite fittings?

No, mixing brands may cause quality issues and void warranty.

What should be done if the temperature is below 5℃?

Extend heating time by 50%.

Download PDF (142 KB)