PPR pipe installation instructions
This guide explains how to install Feisite PP-R pipes using hot-melt connections for plumbing systems. It includes detailed steps for cutting, cleaning, heating, and joining pipes with fittings. Also covers metal-threaded connections and important safety and storage guidelines.
The guide emphasizes using only Feisite-compatible components, proper heating times based on pipe diameter, and precautions for winter installation to avoid damage. This manual is written in Chinese.
| Hot-Melt Temperature | 260±10℃ |
|---|---|
| Cooling Time (for 90mm pipe) | 8 minutes |
| Heating Time (for 20mm pipe) | 5 seconds |
7 seconds.
No, mixing brands may cause quality issues and void warranty.
Extend heating time by 50%.