Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2023-10-29
Featured Feisite manuals

Feisite PP-R Pipe Installation Guide
This guide explains how to install Feisite PP-R pipes using hot-melt connections for plumbing systems. It includes detailed steps for cutting, cleaning, heating, and joining pipes with fittings. Also covers metal-threaded connections and important safety and storage guidelines.
The guide emphasizes using only Feisite-compatible components, proper heating times based on pipe diameter, and precautions for winter installation to avoid damage. This manual is written in Chinese.
Covers: Product Introduction · Hot-Melt Connection Method · Threaded Connection Method · Installation Precautions · Transport and Storage · Warranty and Liability
Latest Feisite manuals
Feisite PP-R Pipe Installation Guide
Installation Guide 3 pages · 142 KB · ZHInstallation instructions for Feisite PP-R pipes, including hot-melt and threaded connection methods.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Feisite manuals
What is the recommended heating time for a 25mm pipe?
7 seconds.
Can Feisite pipes be connected to non-Feisite fittings?
No, mixing brands may cause quality issues and void warranty.
