This is the maintenance and operation manual of permeable concrete
This document serves as an Operations and Maintenance Manual for permeable pavement systems, specifically designed to ensure long-term performance and durability. It outlines a structured schedule of preventative maintenance tasks required to keep the filtration capacity of the pavement intact over time.
Observation wells should be checked 5 days after a rain event to ensure the pavement is draining.
The pavement area must be blown off to remove debris, or at least weekly if rainfall is less than 1 inch.
Weeds should be removed using a systematic herbicide, and the debris must be pulled within the week.