Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-27
Featured Town of Fuquay-Varina manuals

Permeable Pavement Operations and Maintenance Manual
This document serves as an Operations and Maintenance Manual for permeable pavement systems, specifically designed to ensure long-term performance and durability. It outlines a structured schedule of preventative maintenance tasks required to keep the filtration capacity of the pavement intact over time.
Covers: Maintenance & Inspection Schedule · Weekly Tasks · Quarterly Tasks · Annual Tasks · General Requirements · Ownership Transfer
Latest Town of Fuquay-Varina manuals
Permeable Pavement Operations and Maintenance Manual
User Manual 2 pages · 80 KB · ENThis manual establishes procedures for the maintenance and operation of permeable pavement stormwater control structures.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Town of Fuquay-Varina manuals
How often should observation wells be checked?
Observation wells should be checked 5 days after a rain event to ensure the pavement is draining.
What is required after every 1 inch rainfall event?
The pavement area must be blown off to remove debris, or at least weekly if rainfall is less than 1 inch.
