Feasibility Report with Integrated Environmental Assessment of the Des Moines River Basin Master Reservoir Regulation Manual
This feasibility report with integrated environmental assessment was prepared by the U.S. Army Corps of Engineers, Rock Island District, in June 2018. It addresses the Des Moines River Basin Master Reservoir Regulation Manual for Red Rock Dam and Saylorville Dam, which create Lake Red Rock and Saylorville Lake.
The report evaluates alternatives for updating reservoir water control plans to address increased flooding, sedimentation, and water supply needs. Alternative 6 is recommended as the preferred plan and would replace the current manual without requiring construction or additional operational costs.
The U.S. Army Corps of Engineers, Rock Island District, prepared the report.
Alternative 6 is the preferred alternative and is recommended for replacing the current manual.
No, the recommended plan requires no construction and no additional implementation or operational costs.
The current manual was approved in 1992.