The document introduces stormwater management system operation and maintenance guide
This manual covers the stormwater management system for the Babin Landscaping site at 23-29 Hollis Street in Pepperell, Massachusetts. It was prepared to meet the Massachusetts Department of Environmental Protection stormwater standards and provides a guide for regular inspection and maintenance.
It describes the design basis, operation of BMPs, and inspection and maintenance measures for porous pavers, catch basins, subsurface drainage chambers, forebays, leaching basins and areas, and emergency spillways. Appendices include inspection and maintenance logs and plans.
| Peak rate attenuation design storms | 2, 10, 25 and 100-year frequency storms |
|---|---|
| Design basis standard | USDA Natural Resources Conservation Service Technical Release 20 |
| Regulatory basis | Massachusetts Stormwater Standards |
| Emergency spillway design event | 100-year rainfall event |
| Catch basin inspection frequency | Once per year |
The owner of the site is responsible for inspection and maintenance of the drainage system.
Catch basins should be inspected once per year.
The system was designed for 2, 10, 25 and 100-year frequency storms.
It provides an escape for ponded water and is designed to safely pass the 100-year rainfall event.