Murphy Company LVL Installation Guide

For professional guidance on design, construction techniques and product usage information.


Murphy Company LVL Installation Guide - cover page
Brand
Murphy Company
Category
Other
Document type
Installation Guide
Language
English
Pages
8
File format
PDF
File size
1.3 MB
Published
21 October, 2023
Updated
21 October, 2023
MD5 checksum
742D0F02EC436752B61FD740E3CED9E3

About this manual

This guide provides installation instructions for Murphy Company’s LVL (Laminated Veneer Lumber) product, designed for heavy-load and multi-span applications. It includes connection details for beams, bearing on columns and walls, nail specifications, and side-load capacities for multi-ply assemblies. The guide also covers notching, shear design equations, hole locations, handling, storage, and technical support. All information is based on industry standards and third-party testing by APA.

What's inside

  • Connection Details
  • Multiple Piece Assembly & Side Load Capacity
  • Notching Details
  • Shear Design Equations
  • Hole Locations
  • Handling and Storage Guidelines
  • Technical Support

Specifications

Maximum Beam Depth for 2-ply3 1/2"
Maximum Beam Depth for 3-ply5 1/4"
Maximum Beam Depth for 4-ply7"
Lateral Support Spacing24" on center

Frequently asked questions

What is the maximum beam depth for a 2-ply LVL?

Maximum 3 1/2" wide 2-ply beams.

How should LVL be stored?

LVL should be protected from the weather and stored lying flat, not in contact with the ground, in wrapped bundles with air circulation.

What is the nail spacing for 16d Common nails?

Minimum 5" for single row, 6" for multiple rows.

Can LVL be cut or drilled?

Except as described in this product guide, LVL should not be cut, drilled or notched.

Download PDF (1.3 MB)

More Murphy Company Manuals


View all Murphy Company manuals →