This is a pdf manual about Elkay ezh2o. It introduces the installation, maintenance and use methods
This manual provides installation instructions for the Elkay EZH2O in-wall bottle filling station and cooler. It includes safety guidelines, electrical requirements, and steps to ensure proper plumbing and grounding. The document also covers maintenance and care to prevent issues like metallic taste from electrolysis.
Important notes include using plastic drain fittings to electrically isolate the unit, installing a GFCI, and ensuring compliance with local plumbing and electrical codes. All service must be performed by an authorized service person.
The unit uses HFC-R134a refrigerant.
Drain fittings provided by the installer should be made of plastic to electrically isolate the fountain from the building plumbing system.
The manual suggests that the bottle filler be protected by a ground fault circuit interrupter (GFCI).