Allied Air Enterprises LLC BCE5C One-Piece PSC Air Handler Installation Guide

This is a guide to installing and maintaining an air conditioner


Allied Air Enterprises LLC BCE5C One-Piece PSC Air Handler Installation Guide - cover page
Brand
Allied Air Enterprises LLC
Category
Air conditioner
Document type
Installation Guide
Language
English
Pages
22
File format
PDF
File size
5.2 MB
Published
21 October, 2023
Updated
21 October, 2023
MD5 checksum
3344786A0E7FA9F64019AF336F420391

About this manual

This guide provides step-by-step instructions for installing the BCE5C One-Piece PSC Air Handler, including unit dimensions, shipping contents, installation clearances, and electrical connections. It also covers safety precautions, such as sealing electrical wires and refrigerant lines, and compliance with NFPA and NEC standards. Maintenance procedures for homeowners and professionals are included, along with warnings about refrigerant handling and construction use.

What's inside

  • Unit Dimensions – Upflow – Inches (mm)
  • Shipping and Packing List
  • General
  • Requirements
  • Use of Air Handler During Construction
  • Installation Clearances
  • Installation
  • Condensate Drain
  • Duct System and Filters
  • Brazing Refrigerant Lines

Frequently asked questions

What is the minimum open area required for louvers on -042 through -060 models?

The minimum open area for the louvers must be 450 square inches for -042 through -060 models.

How many people are required to move and install the unit?

Two or more people must be used when moving and installing the unit to avoid injury.

What is the minimum height required for heating elements in a garage installation?

Heating elements must be at least 18 inches above the floor for a garage installation.

Download PDF (5.2 MB)

More Allied Air Enterprises LLC Manuals


View all Allied Air Enterprises LLC manuals →