This manual is for use with LUF, LHF, LBF, LBR and LHR oil-fired furnaces.
This guide provides step-by-step installation instructions for Allied Air Enterprises LLC’s oil-fired furnace models LUF, LHF, LBF, LBR, and LHR. It covers critical safety warnings, location requirements, clearance specifications, venting setup, filter installation, start-up procedures, and maintenance steps. The document also includes wiring diagrams and compliance with NFPA, NEC, and CSA standards. Proper installation is emphasized to prevent injury or property damage.
A minimum of 24" is recommended in front of the furnace for servicing the burner on all models. See Table 2 on page 4 for a complete listing of the minimum clearances required for basement type and up flow installations.
No, this furnace is not approved for installation in a mobile home. Installation in a mobile home could result in actions that could cause property damage, personal injury, or death.
The installation must conform to the requirements of the National Fire Protection Association Standard for the Installation of Oil Burning Equipment, NFPA No. 31; the National Electrical Code, ANSI/NFPA No. 70 (in the USA); the Installation Code for Oil Burning Equipment, CSA Standard CAN/CSA B139 (in Canada); the Canadian Electrical Code Part 1, CSA 22.1; the Recommendations of the National Environmental Systems Contractors Association; and any state or provincial laws or local ordinances.