This document is a Contractor Installation Manual for Fuji Clean USA Residential Systems CE and CEN Models. It describes the installation process.
This manual provides step-by-step instructions for installing Fuji Clean CE and CEN residential wastewater treatment systems. It includes details on equipment supplied, riser installation, tank placement, electrical connections, and system activation. The guide also covers treatment process overview, blower sizing, and uplift restraint options. Proper installation is required to activate warranty and ensure system performance.
| Riser Height Limit | 24 inches maximum |
|---|
SJE Rhombus Signalmaster Float Switch, FujiMAC “R Series” UL Approved Air Blower, Tank Adaptor Fitting, Blower Adaptor Fitting with Barb, 1/8” Vinyl Micro-Tubing, NEMA 4X Rated Alarm/Controller, NSF 40/245 Dataplates, Installation Manual, Owner’s Manual, Fuji Clean Processor, Air Vent Plug.
The maximum riser height allowed is 24 inches.
To activate the system warranty, Fuji Clean USA must receive the Warranty Activation Card, which is referenced on page 13 of the manual.