This manual describes the quick installation and use methods of Fronius Symo GEN24 3-5 kW / 3-5 kW Plus 6-10 kW / 6-10 kW Plus Fronius Smart Meter 63A-3 / TS 65A-3 BYD Battery-Box Premium HVS / HVM LG RESU FLEX products.
This guide provides step-by-step instructions for installing and commissioning Fronius Symo GEN24 inverters with compatible smart meters and battery systems. It includes wiring diagrams, connection procedures for BYD Battery-Box Premium and LG RESU FLEX, and safety warnings. The guide also covers setup for Fronius Solar.start and LG RESU Monitor interfaces, including WiFi configuration and Modbus connections.
Safety precautions are emphasized, including the requirement that only trained personnel may install or commission the equipment, and that all documentation must be read and understood before working with the device.
Operating the equipment incorrectly or poor workmanship can cause serious injury or damage. The inverter may only be installed and commissioned by trained personnel acting in accordance with the technical regulations. Before working with the device, ensure that you have read and understood all the documents provided (both hard copies enclosed with the product and documents provided online.
You must read and understand all provided documents, including hard copies and online versions, before working with the device.
Solar modules that are exposed to light supply voltage to the inverter.
The maximum length for the RS 485 connection is 300 meters.