Banner EZAC-R9-QE8 Safety Interlock Cable Installation Guide

This manual provides instructions on the function and use of the Banner EZAC-R9-QE8 Safety Interlock Cable.


Banner EZAC-R9-QE8 Safety Interlock Cable Installation Guide - cover page
Brand
Voltech
Category
Other Electronics
Document type
Installation Guide
Language
English
Pages
21
File format
PDF
File size
1.3 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
26263FBA5A161AB33F47CA35BC11935C

About this manual

This document provides installation instructions for the Voltech 250-030 Safety Interlock Cable, an accessory designed to connect the AT5600 tester to a Banner EZ-Screen safety light curtain system. The cable ensures operator safety by interrupting high-voltage generation if an operator touches the test fixture during a test program. It is optimized for direct connection to the Banner EZAC-R9-QE8 interface box.

What's inside

  • Introduction
  • Recommended Infra-Red Safety System
  • Description
  • Principle of Operation
  • Cable Schematic
  • Installing the IR Safety System
  • Testing the Safety System
  • Operating the AT5600

Specifications

Cable Length1.75 meters
ConstructionHigh-quality shielded cable and terminations
AT5600 TerminationSlimline 9-way d-type plug
Safety System TerminationColor-coded wires with bootlace ferrules
Cable Gland Size20mm

Frequently asked questions

What safety system is this cable optimized for?

The cable has been optimized for use with the Banner EZ-Screen safety light curtain system.

How does the safety system stop a test?

If any one of the three pairs of wires become un-linked during a test, the AT5600 switches off any high voltage that is being produced.

What is the primary control function of the yellow and blue wires?

The primary generator power is passed through the yellow and blue leads, acting as the primary control element.

Download PDF (1.3 MB)

More Voltech Manuals


View all Voltech manuals →