Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual

This manual introduces Triton Stormwater Solutions underground stormwater storage chamber product design parameters including location and size


Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual - cover page
Brand
Triton Stormwater Solutions
Document type
User Manual
Language
English
Pages
30
File format
PDF
File size
3.9 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
48162244A5061F1F9C98610CBA952E7D

About this manual

This manual helps designers implement Triton underground stormwater storage chambers by outlining initial considerations, system sizing methods, and layout design. It covers site constraints, regulatory requirements, and chamber selection based on volume and location. Designers can use tools like the Triton Site Calculator or HydroCAD to determine system dimensions and stone volume. The guide also addresses applications such as stormwater detention, infiltration, and reuse with impermeable liners.

What's inside

  • Background
  • Purpose
  • Initial Design Considerations
  • System Design
  • Chamber Selection
  • Preliminary System Sizing
  • Storage Table
  • Triton Site Calculator
  • HydroCAD
  • Triton Incremental Storage Calculator

Specifications

Minimum Soil Bearing Capacity2.0ksf (96 kPa)

Frequently asked questions

How can I size a Triton system?

You can size the system using a storage table, the Triton Site Calculator, or HydroCAD, each with different levels of flexibility and accessibility.

What is the minimum soil bearing capacity required?

The soil bearing capacity must be above 2.0ksf (96 kPa).

Download PDF (3.9 MB)

More Triton Stormwater Solutions Manuals


View all Triton Stormwater Solutions manuals →