Featured Triton Stormwater Solutions manuals

Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual
This manual helps designers implement Triton underground stormwater storage chambers by outlining initial considerations, system sizing methods, and layout design. It covers site constraints, regulatory requirements, and chamber selection based on volume and location. Designers can use tools like the Triton Site Calculator or HydroCAD to determine system dimensions and stone volume. The guide also addresses applications such as stormwater detention, infiltration, and reuse with impermeable liners.
Covers: Background · Purpose · Initial Design Considerations · System Design · Chamber Selection · Preliminary System Sizing

Triton Stormwater Solutions Main Header Row O&M Manual
This manual provides step-by-step instructions for inspecting and maintaining the Triton Stormwater Solutions Main Header Row system. It details how to access and clean sediment from the system using vacuum trucks or high-pressure flushing methods. The system is designed to capture sediment during rain events or maintenance, reducing long-term maintenance costs. Inspection frequency varies by location, with initial checks every six months and annual inspections thereafter.
The manual includes maintenance procedures, sediment depth measurement guidelines, and a sample maintenance log. It also notes that the system can be part of a treatment train and recommends pre-treatment for extended service life and pollutant capture.
Covers: Introduction · Main Header Row™ Inspection · Main Header Row™ Maintenance · Step-by-Step Maintenance Procedures · Sample Maintenance Log

Triton Stormwater Solutions Chamber System Installation Instructions
This manual provides the requirements for the proper installation of the Triton Stormwater Solutions Chamber System. It emphasizes that non-adherence may result in damage to chambers, which are costly and time-consuming to replace. Installers are advised to inspect chambers for distortion, damage, and joint integrity as work progresses. The guide details necessary materials, equipment, and safety precautions before beginning the installation process.
Covers: Before You Begin · Requirements for System Installation · Requirements for Excavating and Preparing the Site · Requirements for Assembling Inlet Pipes · Requirements for Installing the Chambers
Latest Triton Stormwater Solutions manuals
Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual
User Manual 30 pages · 3.9 MB · ENDesign guide for installing Triton underground stormwater storage chambers to meet regulatory and site-specific requirements.
Triton Stormwater Solutions Main Header Row O&M Manual
User Manual 4 pages · 1 MB · ENUser manual for Triton Stormwater Solutions' Main Header Row system, covering inspection, maintenance, and sediment management procedures.
Triton Stormwater Solutions Chamber System Installation Instructions
Installation Guide 20 pages · 6.2 MB · ENInstallation instructions for the Triton Stormwater Solutions Chamber System, covering site preparation, excavation, and assembly requirements.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Triton Stormwater Solutions manuals
How can I size a Triton system?
You can size the system using a storage table, the Triton Site Calculator, or HydroCAD, each with different levels of flexibility and accessibility.
From: Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual
What is the minimum soil bearing capacity required?
The soil bearing capacity must be above 2.0ksf (96 kPa).
From: Triton Stormwater Solutions Underground Stormwater Storage Chamber Design Manual
What is the sediment depth threshold for cleaning?
If the average depth of sediment exceeds 11" (279.4mm) in the bottom of the Sump Basin and/or if there is 3" (76.2mm) throughout the length of the Main Header Row, the Sump Basin and Main Header Row should be cleaned.
From: Triton Stormwater Solutions Main Header Row O&M Manual
What is the Main Header Row used for?
It captures sediment and protects distribution chamber storage areas from sediment accumulation.
From: Triton Stormwater Solutions Main Header Row O&M Manual
What should contractors do if they find discrepancies with the system subgrade soil's bearing capacity?
The contractor must report any discrepancies with the system subgrade soil's bearing capacity to the design engineer.
From: Triton Stormwater Solutions Chamber System Installation Instructions
When should contractors contact Triton SWS for installation consultations?
Contractors should contact Triton SWS at least 10 days prior to system installation to arrange a pre-installation consultation.
From: Triton Stormwater Solutions Chamber System Installation Instructions