Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual

This manual introduces the operation of WALINGA AL 1314 , AL 1618 , AL 2224 2 PCS, including product features, installation, maintenance and maintenance.


Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual - cover page
Brand
Walinga
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
18
File format
PDF
File size
2.5 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
974CD44A3C58E8CD89D0A665716986A2

About this manual

This document is the Operator's Manual for Walinga drop-through rotary airlocks, specifically models AL 1314, AL 1618, and AL 2224. It details the operating principles, key guidelines such as direction of rotation and tip clearances, and provides instructions for scheduled maintenance.

What's inside

  • Introduction
  • Key Operating Guidelines
  • Scheduled Maintenance
  • Troubleshooting
  • Airlock Maintenance
  • Rotary Airlock Components

Specifications

Maximum Tip Clearance (Model 1314)0.014
Maximum Tip Clearance (Model 1618)0.016
Maximum Tip Clearance (Model 2224)0.020
Preferred Tip Clearance (Model 1314)0.006
Preferred Tip Clearance (Model 1618)0.007
Preferred Tip Clearance (Model 2224)0.009
Maintenance Interval500 hours total operation or 500 tonne wheat equivalent or 3 months intermittent operation

Frequently asked questions

Which direction must the airlock rotor move?

The airlock rotor MUST MOVE COUNTER - CLOCKWISE WHEN VIEWED FROM THE DRIVEN END.

What is the preferred tip clearance for Model 2224?

The preferred tip clearance for Model 2224 is 0.009.

When should commissioning checks be performed?

Commissioning checks should be performed within the first 2 hours of operation and again within 10 hours.

Download PDF (2.5 MB)